Registration Number (HPBC) | 256 |
Design Checking Duration | |
Under Constructed Duration | |
Developer | FMI Riverside Development Ltd. |
Storey | 18 Storey |
Building Type | - |
Address | No.(815), (8) Quarter, Hlaing Strand Road, Hlaing Tharyar Tsp |
Project Status | Projects List Delay Projects |
|
|
Accredited Checker
|
|
Architectural TAG
|
|
|
|
Accredited Checker
|
|
Architectural TAG
|
|
|
|
Accredited Checker
|
|
Architectural TAG
|
|
|
|
Accredited Checker
|
|
Architectural TAG
|
|
|
|
Accredited Checker
|
|
Architectural TAG
|
|
|
|
Accredited Checker
|
|
Architectural TAG
|
Architecture | Recommanded.(3.9.2024) Sent YBPS (Online). (4.9.2024) |
---|---|
Structure | |
Geotechnical | |
Electrical | 1. Recommended on (3.9.2024) 2. Sent YBPS (Online) on (4.9.2024) |
ACMV | 1. Recommended on (3.9.2024) 2. Sent YBPS (Online) on (4.9.2024) |