Background

Quick Link

Screenshot 2025-06-01 193409

HPBC COMMITTEE

According to Resolution No.8/2015, adopted at the meeting of the Economic Committee of the Union of Myanmar...

Low angle shot of a facade of a white modern building under a blue clear sky

HPBC INFORMATION

HPBC members are empowered to carry out in defining guidelines regarding the design of High-Rise Building in Myanmar...

Screenshot 2025-06-01 194328

HPBC PROJECT

All High-Rise projects submitted to HPBC organization since 2003 to today can be seen here on the project page...

news-background
HBPC Home

About Us

High-Rise and Public Building Projects Committee (HPBC) members are empowered to carry out in defining guidelines regarding the design of High-Rise Building in Myanmar, drawing up guidelines for Quality Control of the High-Rise Building Projects which must be duty observed by Project Supervisors and Site Engineer....

HBPC Home

Technical Development

OUR SERVICE

We Provide Excellent Service

Recommendation to Pile Load test

Conduct initial and routine pile load tests as per MNBC Part 4, Section 4.2.7 to verify design capacity.

Recommendation to Pile Design

Design piles per MNBC Part 4, Section 4.2, considering soil conditions, settlement, and seismic forces.

Recommendation to Deep Excavation

Follow MNBC Part 4 and Part 7 for safe deep excavation with proper earth retention systems.

Recommendation to Architect Detail Design

Ensure architectural detailing complies with MNBC Part 2 for fire safety, access, and climate response.

Recommendation to Foundation Design

Design foundations per MNBC Part 4 for bearing capacity, settlement, and seismic safety.

Recommendation to Superstructure Design

Follow MNBC Part 3 for seismic, wind, and load-resistant structural design in high-rise buildings.

Recommendation to Electrical Design

Design electrical systems as per MNBC Part 5 with grounding, load safety, and backup power.

Recommendation to ACMV Design

Use energy-efficient ventilation systems as per MNBC Part 5 suited for Myanmar’s climate.

Recommendation to Water and Sanitation Design

Ensure water supply and drainage comply with MNBC Part 5, with storage and pressure systems.

Project Inspection

Carry out thorough site inspections at key milestones—as per MNBC —to check compliance with recommended design, safety, and local conditions.

Low angle shot of a facade of a white modern building under a blue clear sky
Our Related Sites
ministry-of-construction-1-removebg-preview

MOC

Myanmar-Engineering-Counsil-1

MEngC

npt

NPTCDC

nssa_logo

NSSA

YCDC-1

YCDC

dri-PNG-1

NSQD

MAC-png-1

MAC

mdy-removebg-preview

MCDC

mes-1

Fed.MES

MFSD-1

MFSD

ministry-of-construction-1-removebg-preview

MOC

Myanmar-Engineering-Counsil-1

MEngC

npt

NPTCDC

nssa_logo

NSSA

YCDC-1

YCDC

dri-PNG-1

NSQD

MAC-png-1

MAC

mdy-removebg-preview

MCDC

mes-1

Fed.MES

MFSD-1

MFSD

ministry-of-construction-1-removebg-preview

MOC

Myanmar-Engineering-Counsil-1

MEngC

npt

NPTCDC

nssa_logo

NSSA

YCDC-1

YCDC

dri-PNG-1

NSQD

MAC-png-1

MAC

mdy-removebg-preview

MCDC

mes-1

Fed.MES

MFSD-1

MFSD

The Committee for Quality Control of High-Rise Building Construction Projects (CQHP) was established in Myanmar on August 11, 2003, with nine members, including an architect and eight structural engineers. Reforms in 2004 and 2007 expanded the committee’s expertise to include mechanical, geotechnical, water, sanitation, and electrical engineering. Subsequent changes in 2015 and 2016 adjusted membership numbers and roles within the committee. In 2019, the CQHP was restructured into the High-Rise and Public Building Projects Committee (HPBC), which saw further expansions and publications. By 2024, the HPBC had twenty-seven members and employed thirty-four staff, overseeing various construction projects in Myanmar.

© 2025 HIGH-RISE AND PUBLIC BUILDING PROJECTS COMMITTEE​