Registration Number (HPBC) | 122 |
Design Checking Duration | |
Under Constructed Duration | |
Developer | MGW Construction Co.,Ltd. |
Storey | 23 |
Building Type | - |
Address | No.125/127, Sayar San Road, Yankin Township. |
Project Status | Projects List Completed Projects |
Architecture | |
---|---|
Structure | |
Electrical | 1. Presentation on (12.1.24) 2. Sent comment on (29.1.2024) 3. Company submitted comment's reply (1 set) on (15.2.2024) 4. Comment's reply Discussion with PE on (7.3.24) 5. Sent comment on (26.3.2024) 6. Company submitted comment's reply (4sets) on (2.4.2024) 7. Sent email to Archi Section about that MEP Drawings do not match with Architectural drawing (2.8.2024) 8. Waiting for Archi Update Drawing 9. Sent back design drawing, report & calculation (3Sets) to company on (5.11.2024) 10. Company resubmitted design drawing, report & calculation (3Sets) on (7.2.2025) 11. Company resubmitted design drawing, report & calculation (2Sets) on (18.2.2025) 12. Checking |
ACMV | 1.Presentation on (12.1.24) 2.Sent comment on (29.1.2024). 3.Waiting for Comment's reply 4. Remind via phone (25.7.2024) 5. Sent email to Archi Section about that MEP Drawings do not match with Architectural drawing (2.8.2024) 6. Sent back design drawing, report & calculation (3Sets) to company on (5.11.2024). 7. Company submitted design drawing, report & calculation (3Sets) on (7.2.2025). |
Water and Sanitation |