Registration Number (HPBC) | 192 |
Design Checking Duration | |
Under Constructed Duration | |
Developer | Shwe Zabu Deik Construction Co., Ltd |
Storey | 1B + 21 1/2 Storeyed |
Building Type | |
Address | N0.228, Alone Road, Alone Township. |
Project Status |
Project Status | |
Architecture | 1. Recommended for Architecture and Structure. (21.5.2018) |
Structure |
1. Recommendation for ULT (8.2.2016) 2. Recommendation for WLT-1&2(18.2.2016) 3. Presentation for Revised Pile Load Test presentation(5.9.2016) 4. YCDC letter to proceed the progress (3.4.2017) 5. Recommended for revised PLT (24.7.2017) 6. Recommended for DE (5.11.2017) 7. Recommended for Piling. (9.1.2018) 8. Recommended foundation and superstructure design. (21.5.2018) 9. Send letter to submit the revised design and drawing which match with revised architectural drawings (13.5.2019) 10. Submit revised drawing and model from company (29.5.2019) |
Electrical | 1. Recommended (30.7.2018) |
ACMV | 1. Recommended (30.7.2018) |
Water and Sanitation | 1. Recommended on (17.9.2018). |