Registration Number (HPBC) 192
Design Checking Duration
Under Constructed Duration
Developer Shwe Zabu Deik Construction Co., Ltd
Storey 1B + 21 1/2 Storeyed
Building Type
Address N0.228, Alone Road, Alone Township.
Project Status

Design Status

Project Status
Architecture 1. Recommended for Architecture and
Structure. (21.5.2018)
Structure 1. Recommendation for ULT (8.2.2016)
2. Recommendation for WLT-1&2(18.2.2016)
3. Presentation for Revised Pile Load Test presentation(5.9.2016)
4. YCDC letter to proceed the progress (3.4.2017)
5. Recommended for revised PLT (24.7.2017)
6. Recommended for DE (5.11.2017)
7. Recommended for Piling. (9.1.2018)
8. Recommended foundation and superstructure design. (21.5.2018)
9. Send letter to submit the revised design and drawing which match with revised architectural drawings (13.5.2019)
10. Submit revised drawing and model from company (29.5.2019)
Electrical 1. Recommended (30.7.2018)
ACMV 1. Recommended (30.7.2018)
Water and Sanitation 1. Recommended on (17.9.2018).