NoCompanyItemAddressIssue Certificate DateCertificate Expire Date
1Positive PioneerBored PilingNo 216/222, #4(A-B), Bo Myat Htun Housing, Bo Myat Htun Street, Corner of Maharbandoola Road and Pazuntaung Township, Yangon1.6.20222027 May
2Win pilingSheet pile & Bored Pile & Press PileNo. 18, Lan Thit Road,Nanthar gone Quarter, Insein Tsp, Yangon Myanmar9.6.20222027 June
3Urban Tower Piling (Yangon License)Press pileNo.16, Building 47, Bahosi housing , Lanmataw Township, Yangon8.2.20232028 February
4Joyance International Co.LtdBored Pile &Press Pile & Sheet PileNo.28, Ngar Man Aung Pagoda Street, 33 wrad, North Dagon Township , Yangon , Myanmar23.5.20232028 May
5CJ Piling Co.,LtdPress PileNo.1194, 2nd Floor, Pinlon Road, North Dagon Township, Yangon2028 May
6Golden Moon Co.,LtdBored PilingNO (25/9), Yadanar Road, (16/2) Ward, Thingangyun Township, Yangon, Myanmar30.5.20232028 May
7Han Myanmar Constructin Co.,Ltd.Press PilingNO (19/20),Corner of Myawaddy Min Gyi Street and U Shwe Myoue Street, Shwe Pyi Tha Industrial Zone 4, Yangon, Myanmar19.6.20232028 June
8ScanpilePress pile50 Street Condo, Tower B, 6th floor, 50 Street, Lower Block, Botahtaung Township, Yangon, Myanmar5.5.20232028 May
9Crown Advanced Construction Co.,Ltd.BoredNo.(45), U Tun Nyo Street, Zone(3), Shwe Pyi Thar26.9.20232028 September
10Asia Oracle Co.LtdBored & SheetNo.151, 16th Street (Upper), Landmadaw Tsp, Yangon21.8.20232028 August
11Nay Kabar Myanmar Construction Company LimitedPress PileTower (B), Room 1P, Royal Maung Bamar Residence, Dhamaryone Street, Near Pyay Road, Hlaing Tsp, Yangon28.2.20242026 February
12Asia Concrete Co;LtdSheet pile Press PileNo (166A), Seikanthar Road, Industrial Zone (3), Shwe Pyi Thar Township, Yangon.11.7.20242026 June
13Myanmar V- Pile Co.,ltdPress Pile, Bored Pile19.6.20242026 June

The Committee for Quality Control of High-Rise Building Construction Projects (CQHP) was established in Myanmar on August 11, 2003, with nine members, including an architect and eight structural engineers. Reforms in 2004 and 2007 expanded the committee’s expertise to include mechanical, geotechnical, water, sanitation, and electrical engineering. Subsequent changes in 2015 and 2016 adjusted membership numbers and roles within the committee. In 2019, the CQHP was restructured into the High-Rise and Public Building Projects Committee (HPBC), which saw further expansions and publications. By 2024, the HPBC had twenty-seven members and employed thirty-four staff, overseeing various construction projects in Myanmar.

© 2025 HIGH-RISE AND PUBLIC BUILDING PROJECTS COMMITTEE​